Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

The Toyota FT-1 concept would make a damn fine new Supra

Mon, 13 Jan 2014

The Detroit auto show is just getting started, and Toyota has kicked things off with a nice surprise: The racy FT-1 concept. A product of Toyota's Calty Design Research facility, the FT-1 concept shares some of the swoops and vents with the Lexus RC F. But there's a boatload of high-performance styling cues there, too: Take a quick glance and you might spot the front end of a Ferrari Enzo, the profile of the Nissan GT-R, the double-bubble roof of the SRT Viper/any number of Zagato creations and the oversized retractable rear wing of the McLaren P1.

Toyota FT-86 II (2011) first official picture

Thu, 27 Jan 2011

Toyota will show a second-gen FT-86 II at the 2011 Geneva motor show. It's unusual to 'facelift' a concept car, but Toyota has form with the much-revised Lexus LF-A concept car which donned more clothes than a model sashaying down the catwalk during its long gestation. The FT-86 II is essentially be a much closer to production look at Toyota's new sports car.

Detroit Electric delays SP:01 again

Mon, 26 Aug 2013

Detroit Electric, the new startup with an old name, said it is delaying production because it hasn't secured a lease or purchase agreement for its manufacturing facility in Plymouth, Mich. It is also talking to some new partners, though the company declined to name them. North American president Don Graunstadt told the Detroit News, “To further elaborate at this juncture is, unfortunately, not possible as Detroit Electric have entered into negotiations with other parties that have the potential to impact our business strategy and timing,” Graunstadt said.